Skip to content
← All checklists

Access Control

Access-controlled door commissioning

Test every door before handover.

Zi-On
Site
Date
Technician
Reference

Function

  • Valid credential grants access; invalid credential denied
  • Door forced and door held-open alarms raised
  • Request-to-exit releases the door without an alarm
  • Door closer re-latches the door against seals and wind
  • Events appear in software with the correct door name

Life safety

  • Escape-route doors allow free egress at all times
  • Green break-glass cuts power directly to fail-safe locks
  • Fire alarm signal releases the door
  • Mains and battery failure behaviour matches the design (fail-safe / fail-secure)

Hardware

  • Lock voltage correct at the lock under load
  • Flyback diode fitted across DC lock coils (if not built in)
  • Reader cabling on the secure side; OSDP Secure Channel where supported
  • PSU battery backup tested

Notes / defects

Technician signature

Client / supervisor signature

Zi-On ELV Academy · https://www.elv.zioninnovates.com/toolkit/checklists/access-control-door