Structured cabling installation and handover
Workmanship and documentation checks before practical completion.
- Site
- Date
- Technician
- Reference
Installation
- Containment complete, lids fitted, fill within limits
- Separation from mains power maintained; crossings at 90°
- Bend radius and pulling tension respected (no kinks or crush)
- Hook-and-loop ties used; no overtightened ties
- Service loops left in comms rooms
- All penetrations firestopped and recorded
Terminations and racks
- One wiring scheme (T568A or T568B) throughout
- Untwist within 13 mm at every termination
- Racks bonded to the telecom earth bar; screened panels bonded
- Cable managers fitted; cords dressed neatly
- Blanks fitted to unused faceplate positions
Labelling (TIA-606)
- Every cable labelled at both ends within 300 mm of termination
- Outlets, panels, racks, and rooms labelled to the agreed scheme
- Labels printed, legible, and matching the records
Testing and records
- Every copper link certified to the specified category (no marginal passes if excluded)
- Every fibre link OLTS tested at both wavelengths; loss within budget
- Native test files and PDF summary showing 100% pass
- As-built drawings, rack elevations, and cable schedules
- Manufacturer warranty submitted
Notes / defects
Technician signature
Client / supervisor signature